Science

Methods › D. Whole assessments

Building Block Methodology

Also called: BBM

Not yet reviewed AI-drafted from the references listed · Reviewed by: not yet reviewed · Review date: not yet reviewed

Drafted with AI from the references listed (Claude, by Anthropic). A person has not checked it yet. Confirm details against the original references before relying on it.

What it is

The BBM is a holistic, prescriptive method in which a multidisciplinary specialist team builds a recommended flow regime from 'building blocks' of the natural flow regime: low flows (baseflows) for each season plus the floods and freshes needed for particular ecological or geomorphic functions. The result is one consensus flow regime intended to keep the river in a predefined condition; the workshop sets one flow regime for that condition rather than comparing alternative scenarios. A later phase links the result to engineering and scenario assessment, which the manual calls the least developed part of the method.

How it works

  1. Preparation: assess river condition, choose representative sites, and have specialists (hydrology, hydraulics, geomorphology, water quality, vegetation, invertebrates, fish, social use) compile information in a starter document
  2. BBM workshop (about 20 people; usually about four days, for about four sites): site visit, presentation of results, then specialists select the flow components (building blocks) and set their magnitude, timing and duration, usually as monthly flows
  3. Identify uncertainties and research needs and report the reasoning for each flow component
  4. Follow-up: test the recommended flow regime in a hydrological yield analysis and adjust it where it conflicts with other water users.

What you get

Output
Full flow regime
Kind of answer
One answer: it recommends a single value or flow regime for one objective.

What it needs

Data needs
High
Effort
Multi-year / expert panel
Resolution
Medium to High
Typical team and time at this resolution
ItemMedium resolutionHigh resolution
Specialists2-6 people6-10 people
Environmental flow practitioners1-2 people1-2 people
Duration6-12 months6-24 months
Total effort40-140 person-days130-290 person-days

Typical figures from IFC (2018), Table 5 (p. 60), for one hydropower-project assessment, after King and Brown (2015). Estimates only: travel and stakeholder liaison are not included.

Good for, not suited to

Good for
Setting a single recommended flow regime for a river where a target condition has been agreed and specialist knowledge is available. A simplified version can be used where considerable data on the river already exist.
Not suited to
Comparing or negotiating among alternative flow options, since it builds one consensus regime. Relies on experts knowing which flow events are critical for the river; the full method can take 1-2 years.

Where it came from

Origin
King & Louw 1998; Tharme & King 1998, South Africa (developed early 1990s); construct a flow regime to keep a river in a predetermined condition, later the basis of South Africa's Comprehensive Reserve determinations

Research on this method

Where it was defined

How to run it

Reviews, tests and criticism

Studies that apply it

Other documents cited in the register

Guidance, reports and method documents from the methods register. Most are not in the papers index.

Papers are picked from the papers index, where records are found and classified by AI from titles and abstracts. Check the paper itself before relying on it. Search the papers index for this method.

Family line

Built on it

2 methods built from this one, directly or through another.

Recorded only where a document says one method is based on another; “similar to” is not counted.

About this page

Drafted with AI from the references listed (Claude, by Anthropic). A person has not checked it yet. Confirm details against the original references before relying on it.

Described from the references listed, with key statements matched by script to quoted text from saved copies. Record AM-0009, methods register v1.12. Spotted an error? hello@environmentalflows.com

All methods