Science

Issues › Group E · People and decisions

Values, trade-offs and costs

What environmental flows cost and deliver for people, and how those costs and benefits are weighed against each other.

Group E People and decisions · Code VAL

Also called
  • ecosystem services
  • trade-off
  • cost-benefit analysis
  • economic value
  • willingness to pay
  • hydropower cost
  • forgone generation
  • recreation flows
  • multi-objective optimization
  • structured decision making

Not yet reviewed AI-drafted 2026-10-27 · Reviewed by: not yet reviewed · Review date: not yet reviewed

At a glance

Water left in a river is not used for power, irrigation or city supply, so environmental flows have a cost. They also deliver benefits: fish, clean water, recreation, cultural uses, and the value people place on rivers they may never visit. Studies of hydropower often find flow rules cost a few percent of output or profit. Costs can be much higher in dry years or under strict ramping limits. Surveys show people will pay real money for healthier rivers. Many benefits resist a dollar figure, so BC and others weigh trade-offs openly in structured processes rather than by one number. How sure we are: costs are well measured; benefits much less so.

Questions this page answers

How it works

Every cubic metre released for the river has an opportunity cost: the value it would have had in its next best use. For hydropower the cost comes in two forms. Water released through bottom outlets bypasses the turbines, so energy is lost. Minimum flows and ramping limits also reduce flexibility: the ability to follow peak demand and to provide grid services such as spinning reserve (Pérez-Díaz & Wilhelmi, 2010). For irrigation and city supply, the cost is water not delivered, or the price of buying it back.

Benefits are often grouped as ecosystem services: the goods and services people get from working ecosystems.

Type of valueExamplesHow it is usually measured
Direct useFishing, boating, surfing, drinking waterMarket prices, travel costs, surveys
Indirect useDiluting wastewater, natural purification, erosion controlAvoided costs
Non-useKnowing a river is healthy (existence value); passing it on (bequest value)Stated-preference surveys
Cultural and relationalCeremony, identity, teaching placesDeliberation; often not put in dollars (see IND)

Contingent valuation is a survey that asks people what they would pay (willingness to pay) for a described change. Trade-offs are then weighed in three main ways:

  1. Cost-benefit analysis puts all effects in dollars and compares totals.
  2. Multi-objective optimization uses a model to search for releases that do best on several goals at once. It shows a trade-off curve, where no goal can improve without another getting worse.
  3. Structured decision making has people compare options against agreed objectives and state openly what they would give up.

What the science says

  1. Flow rules often cost hydropower a modest share of profit or output. Well established. In a model of a prototype Ontario plant based on Abitibi Canyon, ramping limits cut daily profit by less than 2% for milder limits and about 8% for the strictest (Niu & Insley, 2013). In Switzerland, existing residual-flow rules are estimated to cost about 1,113 GWh a year, about 3% of expected output from plants above 3 MW. About 770 GWh of that loss, roughly 70%, falls in October to March (Wechsler et al., 2025).
  2. Costs climb in dry years and under strict ramping limits. Growing evidence. For one real plant without a re-regulation reservoir, minimum-flow and ramping rules cut revenue over a month by up to about 14% in a wet year and 39% in a dry year (Pérez-Díaz et al., 2012). A study of another plant across five water-year types and 56 rule combinations found annual losses rose almost linearly with minimum flow and quadratically as ramping limits tightened (Guisández et al., 2013).
  3. Early cost forecasts can overstate some losses. Emerging or debated. Swiss forecasts in 1992 expected residual-flow rules to cost about 6% of production by 2070 under the basic rule, or about 12% with case-by-case increases (Wechsler et al., 2025). A 2026 update puts the basic rule close to that forecast but the case-by-case losses far lower, about 4.5% in all by 2050 (Eawag, 2026). Swiss output has grown by more than 4,000 GWh since 1992 through new plants and upgrades (Eawag, 2026).
  4. Limits at one plant shift costs and emissions across the power system. Growing evidence. In the Ontario model, ramping limits moved generation between hours and changed what thermal plants supplied. Where coal served off-peak and gas served peak demand, the emission benefits exceeded the lost profit (Niu & Insley, 2013). On Finland's Kemijoki, stricter ramping reduced the plant's balancing flexibility and raised system balancing costs. Those costs were comparable to people's willingness to pay for the ecological gains (Juutinen et al., 2025).
  5. People place real dollar value on healthier river flows. Growing evidence. On 45 miles of the South Platte near Denver, households would pay a mean of US$252 a year for restored ecosystem services. Even the most conservative total, US$18.5 million, exceeded the estimated cost of land retirement plus buying instream water (Loomis et al., 2000). On Colorado's Cache la Poudre, recreationists valued extra instream water at low flows more than its marginal value in irrigation (Daubert & Young, 1981).
  6. Environmental needs are a large share of river flow, so the stakes are high. Growing evidence. A global study estimated an average of 37% of annual flow is needed for fair ecological condition, within a range of 25 to 46%. Low-flow months need a larger share, 46 to 71% of average low flows (Pastor et al., 2014). Frameworks now link these flows to ecosystem services and human well-being, including for poorer river communities (Korsgaard et al., 2008; Meijer & van Beek, 2011).
  7. Designing flows with models can find options that serve several goals. Growing evidence. On the San Juan River, modelled "designer flows" still met domestic and farm water needs. They were predicted to reduce non-native fish more than a natural-flow release would, even in drought; the authors describe the work as modelling not yet tried in a river (Chen & Olden, 2017). Eco-engineering decision scaling compares engineering and ecological performance across uncertain climate futures (Poff et al., 2016).
  8. How water is recovered matters as much as how much. Growing evidence. In Australia's Murray-Darling Basin, buying water rights from willing sellers was more cost-effective than subsidizing irrigation efficiency. Those subsidies reduced return flows to rivers and groundwater, and real flow gains were much smaller than claimed (Grafton & Wheeler, 2018).

Values reported in studies

These figures come from particular rivers, species and purposes. They are not standards for any other site.

NumberSourceSetting it came fromCaution
Ramping limits cut daily profit by under 2% (milder) to about 8% (strictest)Niu & Insley, 2013Model plant based on Abitibi Canyon, OntarioOne modelled plant; plant profit, not system cost
Minimum flow plus ramping rules: revenue loss up to about 14% (wet year) to 39% (dry year) over one monthPérez-Díaz et al., 2012One real plant without a re-regulation reservoirMaximum losses; short time horizon
Residual-flow rules cost about 3% of output (1,113 GWh/yr), rising to about 4.5% by 2050Eawag, 2026; Wechsler et al., 2025Swiss plants of 3 MW or moreSwiss law and plant mix
Mean willingness to pay of US$252 per household per yearLoomis et al., 2000South Platte River, ColoradoStated preference; late-1990s dollars
25 to 46% of mean annual flow (average 37%) for fair conditionPastor et al., 2014Global hydrological modelA global estimate, not a site flow
10% holdback on most water licence transfers, the default until 2025Water Canada, 2025Alberta, including the South Saskatchewan basinNow applied only where needed to prevent harm

In Canada

BC built trade-offs into hydropower licensing through water use planning. The 1998 Water Use Plan Guidelines describe a trade-off as how much negative impact on one water-use objective must be accepted to gain on another (Step 6). They call putting impacts in dollars "only one tool, albeit a useful one", and warn against analysis that favours uses that are easy to quantify over those that are hard to measure, such as aquatic habitat (Province of BC, 1998). BC Hydro prepared 23 water use plans between 1999 and 2004. Consultative committees, including First Nations, compared operating alternatives using structured decision making. The Comptroller of Water Rights then issued orders, and reviews began in 2015 (BC Hydro, n.d.; Province of BC, n.d.). The process reached consensus at all but one of 23 facilities (Gregory et al., 2012). On the Jordan River, the Comptroller issued the water use plan implementation order on 20 July 2004, and BC Hydro runs monitoring programs that include salmon spawning and surfing quality below the generating station (BC Hydro, n.d.). The approach is described by Gregory & Failing (2002).

In Ontario, the Abitibi Canyon model remains a key Canadian cost estimate for ramping limits (Niu & Insley, 2013). In Alberta, a 10% conservation holdback on licence transfers was the default until 2025. It now applies only where needed to prevent harm to other users or the environment (Water Canada, 2025).

Elsewhere, Australia's Murray-Darling buybacks are the largest test of buying water for rivers (Grafton & Wheeler, 2018). Switzerland and Finland offer recent estimates of hydropower costs and benefits.

What can be done

  • Action Catalogue: water buybacks and leases for instream flow; conservation holdbacks on licence transfers; re-regulation reservoirs that absorb peaks below a plant; timing rules that place flows where they help most and cost least; drought protocols agreed in advance; physical works in place of some flow; monitoring to reduce uncertainty before costly changes.Matching action types in the Catalogue: F9 Acquire or borrow water from other users · F5 Release and operating rules · F4 Store and release · M2 Effectiveness monitoring and adaptive adjustment
  • Documents and methods: BC Water Use Plan Guidelines (1998); structured decision making; cost-benefit analysis and contingent valuation; multi-objective optimization and designer flows; eco-engineering decision scaling; Alberta conservation holdbacks; Murray-Darling Basin water recovery.
  • Related issues: Policy, allocation and governance (POL); Indigenous and cultural flows (IND); Hydropeaking and ramping (PEAK); Dams, regulation and designed releases (DREL); Drought and water shortage (DRT); Monitoring, effectiveness and adaptive management (MON).

Gaps and debates

  • To put a price on it or not. Dollar values place benefits beside power revenue. Critics say surveys are hypothetical and miss cultural values. BC's guidelines treat monetized values as one tool among several (Province of BC, 1998).
  • Who pays and who gains. Costs fall on operators, ratepayers and irrigators, while benefits spread widely, often to non-users. In the Murray-Darling, many recovery gains went to irrigators as private benefits (Grafton & Wheeler, 2018).
  • Plant cost versus system cost. Lost plant revenue is not the whole picture. Replacement power and emissions can raise or lower the total (Niu & Insley, 2013; Juutinen et al., 2025).
  • Flexibility is gaining value. Ramping limits also cut a plant's balancing flexibility, a cost most earlier studies did not count (Juutinen et al., 2025); as grids need more balancing, that cost may grow.
  • Benefits are less certain than costs. Costs come from detailed operating models. Ecological gains are often predicted, and designer flows remain largely untested in the field (Chen & Olden, 2017).
  • Forecasts versus outcomes. Swiss losses from case-by-case increases have come in far below the 1992 forecast; the basic rule is close to it (Eawag, 2026).
  • Paper water versus wet water. Recovered entitlements do not always mean more water in the river (Grafton & Wheeler, 2018).

Key papers

  1. Grafton & Wheeler (2018). Review of what Murray-Darling buybacks and subsidies actually bought, and at what cost. In the index: SCI-49907
  2. Niu & Insley (2013). Canadian estimate of what ramping limits cost a hydro plant, with system emissions included. In the index: SCI-00024
  3. Gregory et al. (2012). The structured decision making handbook, grounded in BC water use planning. In the index: SCI-48364
  4. Province of BC (1998). The guidelines that set out how BC weighs water-use trade-offs for hydro facilities. Not in the index.
  5. Loomis et al. (2000). Classic survey showing household values for river restoration can exceed its costs. In the index: SCI-49908
  6. Chen & Olden (2017). Shows how optimization can design flows that serve fish and water users together. In the index: SCI-14701
  7. Poff et al. (2016). Framework for weighing engineering and ecological performance under an uncertain climate. In the index: SCI-41377
  8. Guisández et al. (2013). How hydropower revenue losses scale with minimum flows and ramping limits. In the index: SCI-08552
  9. Pastor et al. (2014). Global estimate of how much flow rivers need, which sets the scale of the trade-off. In the index: SCI-04076
  10. Juutinen et al. (2025). Recent comparison of power-system balancing costs with ecosystem-service benefits. In the index: SCI-06788

All papers on this issue (2,439) → paper gallery, filtered to VAL. Main issue of 671 of them.

POL · IND · PEAK · DREL · DRT · MON. Glossary: opportunity cost, ecosystem services, willingness to pay, contingent valuation, non-use value, trade-off curve, structured decision making, water buyback.

About this page

Researched and drafted with AI assistance (Claude, by Anthropic) from the sources cited, 2026-10-27, and checked against them. Reviewed by: not yet reviewed. Review date: not yet reviewed. Until a person has reviewed it, treat this page as a draft: it may contain errors, so check the original sources before relying on it. Corrections to hello@environmentalflows.com. A personal, independent project. General information only, not site-specific advice.